Equipment and Processing Report
September 17, 2008
Production Lines
0
0
Qualification demonstrates that equipment is what it is purported to be and does what it is supposed to do. Installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) are the three steps of equipment qualification.
September 17, 2008
0
0
PharmTech's monthly newsletter, Equipment & Processing Report, reviews the Editor's Picks for the September 2008 edition from LiquaJet and Yokogawa.
September 17, 2008
In the Mixer
0
0
Piston pumps have been a traditional liquid-filling technology for biopharmaceutical manufacturers, but new challenges, stricter validation requirements, and design innovations have led manufacturers to consider peristaltic filling technology.